AbstractAbstract
[en] In Finland, a plant specific, Level 1 and 2 Probabilistic Risk Analysis (PRA) is required as a prerequisite for issuing the construction license and operating license. The use of PRA in various applications and the main insights are presented. These applications include e.g. PRA support to the design of SSCs (Systems, Structures and Components), definition of pre-service and in-service inspection programs, evaluation of the safety classification of SSCs, development of procedures, training and in definition of risk informed technical specifications, periodic testing and on-line preventive maintenance programs. In addition, PRA shall be used to assess the adequacy and coverage of the phase and system commissioning programs. Also the potential risks related to commissioning tests during nuclear test phase, shall be assessed with the help of PRA. In OL3 project, risk informed approach has been applied on a large scale for the first time in the design, construction and commissioning of a new NPP unit. Pre-nuclear commissioning tests have started at OL3 site and the plant is foreseen to begin commercial operation in 2013. Decisions have been made to launch new NPP projects. Teollisuuden Voima Oyj (TVO) is planning to build a new unit (OL4) at Olkiluoto site and a new utility, Fennovoima, is planning to build one unit at one of two alternative green field sites in Northern parts of Finland. Insights from PRAs of operating NPPs have been used in the evaluation of possible new sites to ensure that the site specific concerns and environmental conditions are adequately taken into account in the design of SSCs. Although the seismic activity at the Olkiluoto site is low, a comprehensive seismic risk analysis is being conducted. Its results support the review of the deterministic seismic design. For new sites, a probabilistic seismic hazard analysis has been carried out for the determination of the design earthquake. Experiences from OL3 licensing have been utilized in the further development of risk informed requirements in Finland. (authors)
Primary Subject
Source
Organisation for Economic Co-Operation and Development, Nuclear Energy Agency - OECD/NEA, Committee on the Safety of Nuclear Installations - CSNI, Working Group on Risk Assessment - WGRISK, 46 quai Alphonse Le Gallo, 92100 Boulogne Billancourt (France); 733 p; 19 Jul 2012; p. 488-514; Workshop on PSA for New and Advanced Reactors; Paris (France); 20-24 Jun 2011
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue