[en] On 30 Dec. 2000, Reactor 8 was manually tripped at 06:25 following a part failure of the blue phase circuit breaker, X890, in the 400 kV substation. The reactor was operating under reduced load conditions while on-load refuelling was in progress. Reactor 7 remained under steady full load conditions (671 MW).
Primary Subject
Source
International Atomic Energy Agency, Division of Nuclear Installation Safety, Vienna (Austria); 104 p; ISBN 978-92-0-108516-0;
; Dec 2016; p. 64; ISSN 1020-6450;
; Also available on-line: http://www-pub.iaea.org/MTCD/Publications/PDF/P1755_web.pdf; Enquiries should be addressed to IAEA, Marketing and Sales Unit, Publishing Section, E-mail: sales.publications@iaea.org; Web site: http://www.iaea.org/books; This record replaces 48012254