Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] The final report covers the first completion of the entire CO2 storage life cycle with focus on the post-injection monitoring and post-closure phase at the Ketzin pilot site. The pilot project is the basis for a large-scale climate relevant implementation of the CCS (carbon dioxide capture and storage) technology. During 2008 to 2013 carbon dioxide was injected in the saline aquifer of the Stuttgart formation in a depth of 620 - 630 m. The project has shown that the safe on-shore storage of carbon dioxide according the EU CCS directives (2009) is feasible.
Original Title
Erstmaliger Abschluss des kompletten Lebenszyklus eines CO2-Speichers im Pilotmassstab mit Schwerpunkt auf Ueberwachung bei Stilllegung. Schlussbericht
Primary Subject
Source
Jun 2018; 186 p; FOERDERKENNZEICHEN BMBF 03G0842A; Available from TIB Hannover
Record Type
Miscellaneous
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue