Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] Automatic translation: Concept selection INT-KD: In the closed meeting from January 17-19, 1997, the work results achieved so far for both concepts were evaluated. Overall, both concepts meet the goals set in Efficiency, costs and construction time. The following essential However, arguments led to the LA meeting on 3.2.77 Selection of the INT concept: - Use of the warm liner due to the low He temperature (110°C) at INT leads to advantages Repeat exams Inspectability possibly repairs - The KD concept does not offer any cost advantages compared to INT - The HHT EVU group sees operational disadvantages in the KD concept.
[de]
Konzeptauswahl INT-KD: In der Klausurtagung vom 17.-19.1.77 wurden die bisher erzielten Arbeitsergebnisse für beide Konzepte bewertet. Insgesamt erfüllen beide Konzepte die gesteckten Ziele in Wirkungsgrad, Kosten und Bauzeit. Folgende wesentliche Argumente führten jedoch mit der LA-Sitzung vom 3.2.77 zur Auswahl des INT-Konzeptes: - Verwendung des warmen Liners infolge niedriger He-Temperatur (110°C) bei INT führt zu Vorteilen bei Wiederholungsprüfungen Inspizierbarkeit evtl. Reparaturen - Das KD-Konzept bietet gegenüber INT keine Kostenvorteile - Die HHT-EVU-Gruppe sieht im KD-Konzept betriebliche Nachteile.Original Title
HHT-Projekt: Turbomaschine und konventionelle Kraftverksanlage
Primary Subject
Source
1977; 60 p; Country of input: International Atomic Energy Agency (IAEA); Document from Juelich Preservation Project
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue