Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] The shaft and lane engineering has an important role in mine production. Reasonable programs for excavating may make drilled footage per month to be improved by a large margin. At present, there are lots of programs for excavating in every mine. Therefore, how to choose an appropriate scheme is vital. Combining the practical work experience of the mine for several years in this paper, the matching programs for rapid excavating and equipment were discussed and compared. Meanwhile, the application of the reasonable distribution third scheme was put into practice in the engineering at middle of 190 meters, and better effects were got. Therefore, it can also be acted as the reference for similar mine production. (authors)
Primary Subject
Source
1 fig., 2 tabs., 5 refs.; http://dx.doi.org/10.13426/j.cnki.yky.2016.04.003
Record Type
Journal Article
Journal
Uranium Mining and Metallurgy; ISSN 1000-8063;
; v. 35(4); p. 244-247

Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue