Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] Automatic translation: Summary: The planning work on the prototype system was concentrated in the second half of 1978 on a continuous detailing of characteristic sub-systems and new types of components to secure the design data and Construction drafts, specification of development work and assessment of critical problems in the area of security and approval. The main areas of work and the planning status at the end of 78 are described in the following sections 1. Complete system 2. Security and Authorization 3. Nuclear heat generation system 4. reactor 5. Gas duct and heat exchanger of the NWS 6. Emergency security program explained in summary.
[de]
Zusammenfassung: Die Planungsarbeiten an der Prototypanlage konzentrierten sich in der zweiten Jahreshälfte 1978 auf eine fortlaufende Detaillierung von kennzeichnenden Teilsystemen und neuartigen Bauteilen zur Sicherung der Auslegungsdaten und Konstruktionsentwürfe, zur Spezifizierung von Entwicklungsarbeiten sowie zur Beurteilung kritischer Probleme im Bereich Sicherheit und Genehmigungsfähigkeit. Nachfolgend werden die Arbeitsschwerpunkte und der Planungsstand Ende 78 in den Abschnitten 1. Gesamtanlage 2. Sicherheit und Genehmigung 3. Nukleares Wärmeerzeugungssystem 4. Reaktor 5. Gasführung und Wärmetauscher des NWS 6. Sicherheitssofortprogramm zusammenfassend erläutert.Original Title
PNP Prototypanlage Nukleare Prozesswärme. Vierteljahresbericht IV/1978. Arbeitsbereiche: I. Planung V. Sicherheitssofortprogramm
Primary Subject
Source
1979; 151 p; Country of input: International Atomic Energy Agency (IAEA); Document from Juelich Preservation Project; Figs., tabs.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue