Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.031 seconds
AbstractAbstract
[en] Automatic translation: 1969 was the second year of operation for the AVR reactor. Despite a planned 6-week general inspection in the spring 1969 and a 3 week shutdown of the plant in In the summer of 1969 it was possible to increase the annual availability of 51.4% (1968) to 71.7% (1969) (see Figure 1). The course of the year of operation and the peculiarities that occurred essentially emerge from Figure 2. In 1969 there were 22 business interruptions. Of the 7 shutdown breaks (A to G) with a total of 3 months The duration was 5 shutdowns for inspection and repair work necessary during 2 switch-off pauses (E and F) for dynamic tests and physical measurements were used.
[de]
Das Jahr 1969 war für den AVR-Reaktor das zweite Betriebsjahr. Trotz einer geplanten 6-wöchigen Generalinspektion im Frühjahr 1969 und eines 3-wbchigen Stillstandes der Anlage im Sommer 1969 gelang es, die Jahresverfügbarkeit von 51,4 % (1968) auf 71,7 % (1969) zu erhöhen (vergl. Abbildung l). Der Verlauf des Betriebsjahres und die dabei aufgetretenen Besonderheiten gehen im wesentlichen aus der Abbildung 2 hervor. 1969 waren 22 Betriebsunterbrechungen zu verzeichnen. Von den 7 Abschaltpausen (A bis G ) mit insgesamt 3-monatiger Dauer waren 5 Abschaltpausen für Inspektions- und Reparaturarbeiten notwendig, während 2 Abschaltpausen (E und F) für dynamische Versuche und physikalische Messungen verwandt wurden.Original Title
AVR Atomversuchskraftwerk. Jahresbericht 1969
Primary Subject
Source
1970; 13 p; Country of input: International Atomic Energy Agency (IAEA); Document from Juelich Preservation Project
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue