Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] Automatic translation: The most important operating data of the AVR nuclear test power plant in 4th quarter 1973 can be seen in Table I and Figs. 1 - 3. During the reporting period, the highest time and work availability achieved since the power plant was commissioned. On 10/22 In 1973 the power plant was used to change the temperature measuring tube in the VAMPYR hot gas loop, to replace the dust filter and traversed to carry out some repair and maintenance work. The most important maintenance work is reported in Chapter VII). The shutdown turned into extensive operational measurements utilized. After a generator downtime of approx. 24 hours the power plant was put back into operation on October 23, 1973.
[de]
Die wichtigsten Betriebsdaten des AVR-Atomversuchskraftwerks im 4. Quartal 1973 sind Tabelle I sowie den Abb. 1 - 3 zu entnehmen. Im Berichtszeitraum wurde die höchste Zeit- und Arbeitsverfügbarkeit seit Inbetriebnahme des Kraftwerks erreicht. Am 22.10. 1973 wurde das Kraftwerk zum Wechsel des Temperaturmeßrohrs im Heißgasloop VAMPYR, zum Austausch des Staubfilters sowie zur Ausführung einiger Reparatur- und Wartungsarbeiten abgefahren. Über die wichtigsten Wartungsarbeiten wird in Kapitel VII) berichtet. Das Abfahren wurde zu umfangreichen betrieblichen Messungen genutzt. Nach einer ca. 24-stündigen Ausfallzeit des Generators wurde das Kraftwerk am 23.10.1973 wieder in Betrieb genommen.Original Title
AVR Atomversuchskraftwerk. 4. Quartalsbericht 1973 (1.10.1973 - 31.12.1973)
Primary Subject
Source
1974; 30 p; Country of input: International Atomic Energy Agency (IAEA); Document from Juelich Preservation Project; 6 figs., tabs.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue