Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] Automatic translation: After eliminating a fault in the charging system at the beginning of the quarter, it only ran 3 times briefly when changing experiments interrupted power operation of the AVR power plant in the III. Quarter 1985 satisfactory, without significant impairments. The following operating data were achieved in the 3rd quarter of 1985: - time utilization 93.8% - work utilization 91.9% - Gross work el. 30453.4 MWh Further operating data as well as monthly overviews of the driven Performance can be seen in Figs. 1, 2 and 3.
[de]
Nach der Behebung einer Störung an der Beschickungsanlage zu Quartalsbeginn, verlief der lediglich zum Experimentwechsel 3 mal kurzzeitig unterbrochene Leistungsbetrieb des AVR-Kraftwerks im III. Quartal 1985 zufriedenstellend, ohne nennenswerte Beeinträchtigungen. Nachstehende Betriebsdaten wurden im 3. Quartal 1985 erreicht: - Zeitausnutzung 93,8 % - Arbeitsausnutzung 91,9 % - Bruttoarbeit el. 30453,4 MWh Weitere Betriebsdaten sowie monatliche Übersichten der gefahrenen Leistung sind den Abb. 1,2 und 3 zu entnehmen.Original Title
AVR Atomversuchskraftwerk. 3. Quartalsbericht 1985 (1.7.1985 - 30.9.1985)
Primary Subject
Source
1985; 50 p; Country of input: International Atomic Energy Agency (IAEA); Document from Juelich Preservation Project; 19 figs., 8 tabs.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue