Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] Considerations are made on system redundance in protection systems of the highest class of criteria (class 1, danger of personnel injury) with the result that a 1-out-of-2 closed circuit system is to be preferred to a 2-out-of-3 system. This protecting part may most probably be equally safely constructed from mechanical-hydraulic components as from electro-hydraulic ones. To follow, the criteria classes 2 and 3 are considered which are primarily concerned with the economic aspects. Faults of the 2nd criteria class can be well controlled by 1-out-of-2 open circuit systems, those of 3rd criteria class by 1-out-of-1 open circuit systems. (orig.)
[de]
Es werden Ueberlegungen ueber Systemredundanz bei Schutzsystemen der hoechsten Kriterienklasse (Klasse 1, Gefahr von Personenschaeden) angestellt mit dem Ergebnis, dass ein 1von2-Ruhestromsystem einem 2von3-System vorzuziehen ist. Dieser Schutzteil laesst sich hoechstwahrscheinlich mit gleicher Sicherheit sowohl aus mechanisch-hydraulischen als auch aus elektro-hydraulischen Bauelementen aufbauen. Anschliessend werden die Kriterienklassen 2 und 3 betrachtet, bei denen wirtschaftliche Gesichtspunkte im Vordergrund stehen. Fehler der Kriterienklasse 2 koennen sinnvoll durch 1von2-Arbeitsstromsysteme ueberwacht werden, solche der Kriterienklasse 3 durch 1von1-Arbeitsstromsysteme. (orig.)Original Title
Zuverlaessigkeitsbetrachtungen beim Turbinenschutz. T. 2
Primary Subject
Source
11 figs.; 19 refs.
Record Type
Journal Article
Journal
VGB Kraftwerkstechnik; v. 55(10); p. 655 - 660
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue