Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
AbstractAbstract
[en] A description of some of the more relevant questions relating to advanced alarm systems for nuclear power plant installations. The development of such alarm systems embodies three main tasks: development of formal alarm handling methods, design of alarm patterns, development of alarm analysis systems. The major aspects of these tests are dealt with and the close relation between the alarm analysis and the plant disturbance analysis procedure is emphasized. (author)
Primary Subject
Source
Jan 1977; 16 p; ISBN 8755004431;
; 5 refs.

Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue