Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.039 seconds
Foster, C.G.; Krause, J.D.; Stanley, L.; Visse, P.V.; Cain, D.G.
Nuclear Services Corp., Campbell, Calif. (USA)1976
Nuclear Services Corp., Campbell, Calif. (USA)1976
AbstractAbstract
[en] The final results of Research Project RP503-1 concerning pressure and differential pressure sensor response time verification are presented. A selected sample of nine typical process sensors have been tested using a specially designed hydraulic signal generator and detailed test procedures to verify their ability to produce valid sensor response time measurements in a simulated in-situ configuration. Design details are provided concerning the hydraulic signal generator, and generic test procedures are included to permit the utility user to quickly implement a response time measurement program for these and other similar sensor types
Original Title
Nuclear power plants
Primary Subject
Secondary Subject
Source
Oct 1976; 135 p; Available from NTIS., PC A07/MF A01
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue