Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] Primary containment integrated leakage rate tests (ILRTs) have previously been conducted with a minimum duration of 24 hr. However, analysis of data from recent ILRTs has shown that a test duration considerably less than 24 hr would have been sufficient. This report summarizes these recent ILRTs and analyzes and discusses the test results. Test and analytical methods, including the LEAKFIT computer program, are also discussed. The conclusion is reached that an ILRT with a duration of 6 hr and at least 20 data points is sufficient
Original Title
PWR and BWR
Primary Subject
Secondary Subject
Source
Apr 1977; 90 p; Stone and Webster Engineering Corp., Boston, MA
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue