Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.011 seconds
Hottel, R.E.; Louison, R.; Boardman, C.E.; Kiley, M.J.
Westinghouse Electric Corp., Madison, Pa. (USA). Advanced Reactors Div.; General Electric Co., Sunnyvale, Calif. (USA). Fast Breeder Reactor Dept.; Atomics International Div., Canoga Park, Calif. (USA)1977
Westinghouse Electric Corp., Madison, Pa. (USA). Advanced Reactors Div.; General Electric Co., Sunnyvale, Calif. (USA). Fast Breeder Reactor Dept.; Atomics International Div., Canoga Park, Calif. (USA)1977
AbstractAbstract
[en] The Decay Heat Removal Systems for the Clinch River Breeder Reactor Plant (CRBRP) are designed to adequately remove sensible and decay heat from the reactor following normal shutdown, operational occurrences, and postulated accidents on both a short term and a long term basis. The Decay Heat Removal Systems are composed of the Main Heat Transport System, the Main Condenser and Feedwater System, the Steam Generator Auxiliary Heat Removal System (SGAHRS), and the Direct Heat Removal Service (DHRS). The overall design of the CRBRP Decay Heat Removal Systems and the operation under normal and off-normal conditions is examined. The redundancies of the system design, such as the four decay heat removal paths, the emergency diesel power supplies, and the auxiliary feedwater pumps, and the diversities of the design such as forced circulation/natural circulation and AC Power/DC Power are presented. In addition to overall design and system capabilities, the detailed designs for the Protected Air Cooled Condensers (PACC) and the Air Blast Heat Exchangers (ABHX) are presented
Primary Subject
Secondary Subject
Source
1977; 31 p; Seminar on LMFBR components; Canoga Park, CA, USA; 5 - 8 Dec 1977; Available from NTIS., PC A03/MF A01
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue