AbstractAbstract
[en] Testing and start up operations of a nuclear power plant require careful planning. A detailed program of tests and the responsibility of implementing them is discussed. Requirement of documentation covering the tests and operating procedures is explained. The performance of the system during normal and abnomal operating conditions is analysed and required are modifications carried out. Various phases of commissioning and their significance are explained. Preparation of maintenance documentation and training of operating and maintenance staff during this period are discussed. Necessity of close liaison between the regulatory body and the operating organization is explained. (orig.)
[de]
Der Probe- und Anfahrbetrieb eines Kernkraftwerks erfordert sorgfaeltige Planung. Es wird ein detailliertes Pruefprogramm sowie die Verantwortung bei seiner Durchfuehrung diskutiert. Die Notwendigkeit einer Dokumentation sowohl der Pruefungen als auch der Betriebsvorgaenge wird erlaeutert. Des Systemverhalten unter normalen und anomalen Betriebsbedingungen wird untersucht und die erforderlichen Aenderungen werden durchgefuehrt. Verschiedene Inbetriebnahmephasen und ihre Bedeutung werden erlaeutert. Die Vorbereitung zur Dokumentation von Wartungsarbeiten und die Ausbildung der Betriebs- und Wartungsmannschaft waehrend dieser Zeit werden besprochen. Es wird ferner die Notwendigkeit einer engen Verbindung zwischen Genehmigungs- bzw. Aufsichtsbehoerde und Betreibergesellschaft begruendet. (orig.)Primary Subject
Source
1977; 17 p; IAEA interregional training course on construction and operation management of a nuclear power plant; Karlsruhe, Germany, F.R; 5 Sep - 25 Nov 1977; 3 figs.
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue