AbstractAbstract
[en] Highlights of operation between November 30, 1972 (first synchronisation) and July, 1977 are discussed. Performance of nuclear systems and equipment is analysed and the modifications carried out to improve the availability of the station are presented. Performance of conventional systems and problems on turbine generator were highlighted. The importance of heavy water management to reduce heavy water losses and the performance of on-power fuelling machines are described. The initial problems with the grid and improvements, efforts to indigenise the spares, the manrem consumption for the last four years of operation are also discussed. (orig./HP)
[de]
Es werden die wesentlichsten Betriebserfahrungen zwischen dem 30. November 1972 (erste Netzsynchronisation) und dem Juli 1977 diskutiert. Das Verhalten der nuklearen Systeme und Einrichtungen wird untersucht und die zur Erhoehung der Verfuegbarkeit der Anlage durchgefuehrten Aenderungen werden dargelegt. Das Verhalten der konventionellen Systeme und Probleme beim Turbosatz werden kurz beleuchtet. Die Bedeutung der Schwerwasserhandhabung zur Verminderung der Verluste an schwerem Wasser sowie das Verhalten von Wechselmaschinen fuer den Brennelementwechsel waehrend des Betriebs werden beschrieben. Anfangsprobleme und Verbesserungen, was das Netz angeht, Bemuehungen um eigene Ersatzteilhaltung sowie der manrem-Verbrauch waehrend der letzten vier Betriebsjahre werden ebenfalls diskutiert. (orig./HP)Primary Subject
Source
1977; 13 p; IAEA interregional training course on construction and operation management of a nuclear power plant; Karlsruhe, Germany, F.R; 5 Sep - 25 Nov 1977; 1 fig.; 5 tabs.
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue