Filters
Results 1 - 10 of 745
Results 1 - 10 of 745.
Search took: 0.019 seconds
Sort by: date | relevance |
AbstractAbstract
[en] AECB has completed its first round of simulator-based examinations for candidate shift supervisors and senior operators at each of the plant-specific simulators associated with the seven CANDU reactor sites in Canada. (author)
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Electricite de France is waiting for the French safety authorities to agree to its plan to raise the primary system pH300 at all its PWRs to 7.2. Once agreement is given, the change of chemistry will be implemented without delay, bringing France into line with water chemistry regimes widely practised elsewhere. (author)
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Short communication
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Condenser rebuilding and upgrading was completed at Belgium's Tihange 1 PWR in 10.5 months, from placing of the order to having the new equipment installed and ready for final inspection. AN outline description of the operation is given. (3 figures). (author)
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Short communication
Original Title
BWR ECCS strainers
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Until recently there has been no easy way to determine steam generator (SG) performance while a power plant is actually operating. Now AECL has developed a non-intrusive, ultrasonic system to measure the downcomer flow velocity in an operating steam generator. This system provides a non-intrusive means to monitor whether the SG is performing as specified. (UK)
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] A new method for the solidification of borate concentrate generated at PWRs and sodium sulphate concentrate from BWRs, developed by the Institute of Nuclear Energy Research (INER) in Taiwan, claims to have as much as eight times the volume-efficiency of cementation. (author)
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Short communication
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] The Swedish utility, Vattenfall Fuel, has set up a number of requirements for the fuel of the future in order to improve fuel reliability, increase operational flexibility and safety margins, and decrease collective dose. The elements of their strategy are outlined. These include: a more restrictive approach to Lead Fuel Assembly; improved verification; better focussed R and D; and an improved fuel purchase process. (author)
Primary Subject
Secondary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
AbstractAbstract
[en] Short communication
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue
1 | 2 | 3 | Next |